<menuitem id="v9jbl"><i id="v9jbl"><strike id="v9jbl"></strike></i></menuitem><listing id="v9jbl"></listing>
<var id="v9jbl"><video id="v9jbl"><menuitem id="v9jbl"></menuitem></video></var>
<cite id="v9jbl"><strike id="v9jbl"><thead id="v9jbl"></thead></strike></cite>
<menuitem id="v9jbl"><strike id="v9jbl"><listing id="v9jbl"></listing></strike></menuitem>
<menuitem id="v9jbl"></menuitem>
<var id="v9jbl"><video id="v9jbl"></video></var>
<cite id="v9jbl"></cite>
<var id="v9jbl"></var>
<var id="v9jbl"><video id="v9jbl"></video></var>
<var id="v9jbl"><span id="v9jbl"></span></var>
<cite id="v9jbl"><strike id="v9jbl"></strike></cite>
print this page email this page go to the top of the page
Home
Contact Us
Sitemap
Projects Executed
Elea Golf Infrastructure Project
Client:
S.Z. Eliades Leisure Ltd.
Architect:
N.C. Meletiou Architects and Engineers
Duration: 12 months
Commencement Date: 2009
Completion Date: 2010
Details
Construction of approximately 1,750m road (including a 7m width of asphalt pavement and a 2m footpath on one side), sewerage and storm water drainage, 6 No substations for the Electricity Authority of Cyprus, as well as the construction of a public road.  
Back to Projects Executed
© 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
97久久超碰国产精品…,男女爽爽无遮挡午夜视频,FREE×性护士VIDOS中国,欧美大肚子孕妇疯狂作爱视频
<menuitem id="v9jbl"><i id="v9jbl"><strike id="v9jbl"></strike></i></menuitem><listing id="v9jbl"></listing>
<var id="v9jbl"><video id="v9jbl"><menuitem id="v9jbl"></menuitem></video></var>
<cite id="v9jbl"><strike id="v9jbl"><thead id="v9jbl"></thead></strike></cite>
<menuitem id="v9jbl"><strike id="v9jbl"><listing id="v9jbl"></listing></strike></menuitem>
<menuitem id="v9jbl"></menuitem>
<var id="v9jbl"><video id="v9jbl"></video></var>
<cite id="v9jbl"></cite>
<var id="v9jbl"></var>
<var id="v9jbl"><video id="v9jbl"></video></var>
<var id="v9jbl"><span id="v9jbl"></span></var>
<cite id="v9jbl"><strike id="v9jbl"></strike></cite>